Western-European rail operator

With Computools IoT wagon monitoring system, a European railway operator can track the location and condition of cargo in real-time.

case image

AT A GLANCE

Our team assisted a Western European rail operator in developing a system for real-time cargo fleet positioning. By incorporating safety parameter monitoring and instant alerts for deviations, the client received streamlined fleet management and reduced manual checks. Utilizing the MQTT protocol ensured reliable data transmission and top-notch security, providing our client with IoT-based solution for their cargo operations.

THE CLIENT

The client is a major passenger and cargo transport operator active in Western Europe. The company operates high-speed, regional and city trains, and also has a franchise for national transport. The Company is a major player in the rail cargo market, with an extensive route network and rolling stock fleet.

BUSINESS CHALLENGE

The lack of a real-time wagon monitoring system made it impossible for the customer to track the location and condition of the cargo. These limitations made it difficult to respond quickly to problems and prevent accidents. The client had idle wagons and reduced productivity.

The client wanted to implement a wagon monitoring system, to create an early warning system of potential safety hazards using sensors and detectors.

SOLUTION SUMMARY

Our engineers have developed a real-time freight tracking system that provides operators with accurate positioning of cargo wagons. This also includes data on important safety parameters: volume, pressure, and temperature. The system automatically notifies operators when measured parameters deviate from the norm.

The main components of the system include:

  • Sensors: installed on wagons to collect data on safety parameters.
  • Data acquisition system: collects data from the sensors and transmits it to the central system.
  • Central system: analyses the data and generates alerts.
  • User interface: allows operators to monitor freight data and receive alerts.

IMPACT

The decision to implement IoT in cargo wagons tracking resulted in a reduction in the need for manual inspection of wagons. Before the implementation of the system, 2 manual inspections per day were required. After the implementation of the system, the number of manual inspections decreased. The customer also became more aware of the condition of the wagons. The system provides 24/7 monitoring of safety parameters such as volume, pressure and temperature.

WHY COMPUTOOLS

The client conducted a thorough selection process before choosing us as their partner for this project. They actively researched potential partners through various channels:

  • 01. Online research:
    This involved searching for companies with expertise in developing real-time tracking systems and experience in the transportation
    sector.
  • 02. Industry consultations:
    Consulting with experts in the cargo transport industry could have led them to Computools’ reputation or resulted in direct
    recommendations.

The client considered proposals from several vendors. After a comprehensive evaluation, the client selected Computools for several key reasons:

  • Proven track record
  • Skilled team
  • Client-centric approach
  • Professionalism and understanding
Launch your software solution within 1-3 months instead of years. Unlock tomorrow. Build a future-ready business through innovation.

STORY IN DEPTH

Background

Before contacting Computools, the client conducted research on the Internet. It also consulted experts in the cargo transport industry. Our company took part in the tender by carrying out a small related project, thus demonstrating our expertise. The two sides started cooperation.

Approach to solution

An analysis of existing systems on the market showed that a comprehensive solution was required that would provide real-time monitoring of cargo traffic, predict potential security threats and facilitate rapid response to problems.  The technical plan of the project included a systematic algorithm of step-by-step development, testing and implementation of individual components of the platform.

Computools role

We created a smooth and reliable system for monitoring, processing and storing complete data on trains, timetables, congestion and speed. Our workflow involved several steps. Sensor-generated information from railways and stations was fed into storage facilities and visualised using tables or a special method; then in-depth data analysis was performed, the results of which were carefully documented in reports and distributed via predefined communication channels to specific recipients or systems.

Key decisions and outcomes

Computools helped the client make several key decisions during the project:

  • Utilising the MOTT protocol to ensure high system performance and reliability.
  • Developing customised algorithms to analyse sensor data and generate alerts.
  • Creating a user-friendly user interface for freight monitoring.

Design

In the context of this case, the design phase encompassed a range of tasks aimed at creating an intuitive, visually appealing, and efficient user interface. The design tasks included

USER PERSONA → SITE MAP → WIREFRAMES → USER INTERFACE
railway system user persona

USER PERSONA

Creating detailed fictional profiles representing diverse users for informed design decisions

railway system site map

SITE MAP

Illustrating the platform's structural hierarchy and navigation for intuitive user journeys

railway system wireframes

WIREFRAMES

Drafting skeletal representations to visualise layout and functionality, guiding subsequent design

railway system user interface

USER INTERFACE

Crafting a visually cohesive, intuitive design for an engaging and efficient user experience

DIGITAL PLATFORM & TECHNOLOGY

PROJECT MANAGEMENT METHODOLOGY

We chose the Scrum methodology to handle all the nuances of the development process. The iterative and incremental approach allowed the team to adapt to changing requirements, ensuring flexibility and agility throughout the project. Regular collaboration with the client and continuous feedback are integral components of the Agile methodology.

As part of the overall Agile framework, the Scrum methodology was utilised to provide a structured approach to project management. The project was run through a series of sprints, each consisting of a defined timeframe and a list of tasks to be completed. The Scrum model facilitated planning meetings, where the team identified specific tasks for the upcoming sprint, and sprint demonstrations, which gave stakeholders a tangible view of the project’s progress.

PROJECT MANAGEMENT METHODOLOGY

PROJECT TIMELINE

RAILWAY SYSTEM PROJECT TIMELINE

WHAT OUR CLIENT SAID

Why did we choose Computools? We carefully selected a partner for this project. The selection process included reviewing the portfolio and references, interviewing the team, and receiving and analysing proposals from several companies.
As a result, we chose Computools for the following reasons:

  • Computools’ deep experience in developing complex systems.
  • A strong team of highly skilled developers.
  • Computools’ ability to understand client needs and offer effective solutions.

The team made a favourable impression on us with their professionalism and deep understanding of our needs.

TELL US ABOUT YOUR BUSINESS GOAL

Thank you for your message!

Your request will be carefully researched by our experts. We will get in touch with you within one business day.

WHAT HAPPENS NEXT?

01.
We review your business goal and current situation.
02.
Within one business day, a consultant gets back to you to discuss the goal, constraints, and timeline.
03.
We suggest the right start: a 1–2 week Discovery or a direct path to delivery.
04.
You get a plan with costs, timeline, and expected business impact.
Trusted by: